It's enough to pay for this knowledge in the novice home inspection room.

Another year of delivery, many new homeowners know that the most important thing is to hand over the home inspection room, then when the inspection of the house from where to start it? You may need to understand this knowledge. For the acceptance of the newly-decorated housing, we must pay attention to the following points: First, inspection tools: screwdriver and meter, purchase agreement, more than two people, with a pen and paper. Pay attention to area and floor height. Second, the wall, top, six sides: 1, wall material: red brick, light brick, cinder brick, hollow brick, or prefabricated panels.
2. Wall: Pay attention to whether there is plastering layer on the wall, whether the plaster layer has empty drums, cracks, peeling, mottled, and the squareness of the yin and yang angles. The flatness of the wall between 3 and 5 mm is relatively normal. The doors and windows are closed to see the large surface. The doors and windows are opened to see the small surface. Whether the meter is used to measure the top surface is square, especially on both sides of the door and window openings. Is Founder very important? Whether the wall has done internal insulation. 3, the ground: with or without plaster layer, with or without calendering, with the pedal from the sand, whether the heating pipe, water pipes, electric tubes are in the underground mark, promised whether to achieve heating to the ground. The floor of the kitchen, balcony, and toilet is lower than Other floors. 4, the top: the main attention and the Founder of the ground there is no large skew, pay special attention to the kitchen, balcony, bathroom with no water leakage on the top surface. Third, whether the door and window switch is flexible and flexible, whether the sealing is tight, whether there is warping, deformation, lax closure, etc., all the glasses should be checked one by one for damage, slagging, chipping, sealing is not strict, sealing, anti- Dust strips and waterproof strips must be missing. The key to the entrance door must be fully delivered, the door lock must be safe, the bolt must be opened and closed flexibly, the anti-theft device must be available, easy to use, safe and reliable. Doors and windows need to see the general is: door and window handles, latches, locks, switches and other securely installed, easy to use, open freely, no block, astringent cards and other phenomena. Sliding doors and windows are suspended securely, and the hanging rails and the floor rails are firmly fixed without any skew, sloshing, etc. Pushing and pulling are flexible, and there are no blockages or impetuous phenomena. Fourth, the main viewing of the kitchen and bathroom in Sheung Shui, the main pipeline, sub-pipeline of the water is installed, whether the main control valve, water meter, tap is complete, the valve, water meter, tap, etc. at the joints are leaking, seepage, drip, It is necessary to conduct a water test to check the water pressure, water flow, and water quality. Fifth, the main water to view the kitchen and bathroom, the main water pipes, water pipes under the water is set whether the room, bath, toilet seat, wash basin, etc. at the water outlet is reserved, the kitchen, balcony, bathroom must have a floor drain, Check whether each floor drain has a rake or not. Each drain and floor drain must be checked for drainage. Check each drain and floor drain for clogging and drainage. Sixth, the ground waterproof kitchen, bathroom, balcony floor should be done waterproof construction, inspection of property requires the property must do a closed water test, the method is: the kitchen, bathroom, balcony door closure, the floor drain blocked, in After the plugging of the ground water, water depth of 20 to 30 mm, storage time of not less than 24 hours, downstairs to observe the corresponding room is leaking water. Seventh, the strong electricity detailed looks at each room the socket, the switch, the lamp configuration situation, all power lines should be darkly deposited in the wall top floor, there must be no exposed conductors, each socket, switch, lighting is easy to use. The location of the meter and the switch, the meter should be counted, the switch must be grounded reliably, the corridor, the stairs, and the voice of the elevator, the light control switch must be easy to use. VIII. Weak-electricity television, telephone, internet, audio, and other weak circuits. Any property developers promised should be checked and accepted one by one, such as broadband. Nine, heating according to the room detailed view of the heating pipe, radiator installation is tight, solid, the pipe joints are leaking leaks, view the pressure test records. The water test before the heating period is very important and must be personally involved. It is important to know the position of the main control valve of the household. Attention must never be allowed to tamper with the heating pipe and radiator. X. Central air-conditioning air outlet pipe, condensate outlet pipe, temperature control switch, outlet position is correct, and the installation is firm. XI. Special Note: The exhaust path of the kitchen is the exhaust path of the kitchen, the exhaust air path of the bathroom, its position and function. Twelve, the gas pipeline enters the home, the main pipeline, the sub-pipeline each uses the air room whether to set up, the gas meter, the control valve is complete. Attention must never be allowed to remove the gas pipeline without permission.

Inspection room

Cool and Washable Cotton Mask, you can see many kinds of Masks in this catalog, it`s a fashion and soft Way in this summer to against cornavirus/covid-19, better than traditional KN95/Ffp2 Respirator. And customer can also use PM2.5 Carbon Activated Filter Pad to insert the Mask to make sure the High filtration Efficiency.

Cotton Mask

Cotton Mask,Cotton Face Mask,3 Ply Cotton Mask,Disposable Cotton Mask

CAREABLE BIOTECHNOLOGY CO,. LTD , https://www.careablemask.com