Good Home reminds you that money was spent in unpredicted home improvement budgets

The shortfall is the budget overrun. Before the renovation, all the friends said that the budget was definitely overspending. Therefore, they did not believe this evil. They made very detailed calculations of budgets for large and small, and each budget has hit a large overspending space. I want to be sure that this can only be lower than this, and it cannot be higher than this. At present, it is almost over RMB 10,000, and the calculations have been found to be mainly in some places that are not expected.
Designers who changed the gas cabinets generally requested to modify the gas pipeline. The total charge was 350 yuan, including 200 yuan for shifting watches and 150 yuan for reforms, which was less than 6 meters.
The overheating of water heaters and Yuba is mainly the drilling and adding of money. Now many gas water heaters are installed for a fee, and the price is not low. Perforation is 60 yuan. When installing, it adds 15 yuan to the tube, and the elbow is 30 yuan. A total of 90 yuan is added. Yuba installed drilling also charge. Both of these items cost over 230 yuan in total.
The countertops and the passstones were mistakes. Originally, the windowsill countertops could be paved with small tiles. The foreman said that it was both troublesome and unattractive, and it was easily damaged. Go to the home city to book the countertops and man-made stone countertops. On the day of installation, it was found that the countertop was beige. You can turn the doorstone from the desired beige to black. You can look at the pitiful workers. Well, it's not ugly. They gave money to let them go. The item exceeds 850 yuan.
Plastic steel windows should have no problem with windows, but with the addition of invisible screens, a delay of 80 yuan. When it was installed, it was found that it was not the same thing. The so-called invisible screen window was a screen box hanging on the inner window. It was 7 centimeters beyond the inner window. It was very ugly, and the quality of the screen window was very bad. It's not the same at all. The item was overbooked for 1480 yuan. It is recommended that everyone pay attention to the quality of the installation of plastic windows.
In addition, drying racks to spend 219 yuan; grout 75 yuan; the old air-conditioning transfer machine drilling fee 350 yuan; security door increased lining and more 300 yuan; heating cover aluminum frame and door touch spending 200 yuan; because The irrational heating led to a widening of the countertop surface, which cost 500 yuan more; because of the problem of the color of security doors and interior doors, the paint had to be bought for another 200 yuan; the two floor drains for installing washing machines were 120 yuan, and so on. Overspend nearly 10,000 yuan. Together with the transportation and dining expenses for running the building materials market, there are probably no 5,000 yuan and 3,000 yuan. This is the sum of a good set of bathroom fixtures.

Haier water heater three trees paint window paint heating gas water heater air conditioning price counter cabinet door bathroom design bathroom tile color bathroom tile overall bathroom toilet door tile price renovation home

Chemicals Series

Organic Chemical,Inorganic Chemical,Caustic Soda

Lemandou Chemicals Co., Ltd. , http://www.hbfertilizers.com