[China Aluminum Network] Because each owner's room size and window area requirements are not the same, the requirements for aluminum alloy doors and windows are not the same, so many customers aluminum doors and windows are achieved through customized. What are the steps for the production and construction of aluminum alloy doors and windows?
1, open material
The opening process is a front process and is a key process for the production of aluminum alloy doors and windows. Cutting materials are mainly used for cutting materials. According to the design plan for each measurement size, they are accurately cut into corresponding sizes according to the design requirements. The blank size error value should be controlled within 2mm.
2, punching
Aluminum alloy door and window frame fan assembly is generally used screw connection, so whether it is the assembly of the vertical and horizontal bar parts, or the fixing of the accessories, all need to punch holes in the corresponding position. The punching of the profile requires an accurate position. It is not possible to repeatedly change the punching on the surface of the profile. Once the hole is formed, it is difficult to repair.
3, assembly
The profiles are assembled on the connector by screw connection as required. Aluminum alloy doors and windows are assembled with 45° butt joints, right angle butt joints and vertical butt joints. The connection of horizontal and vertical rods is generally made of special connectors or aluminum corners, and then fixed with screws, bolts or aluminum pull nails.
Aluminum alloy doors and windows accessories:
Aluminum alloy doors and windows all need accessories, the general needs of the accessories are handles, locks, hinges, hinges, auxiliary support, screws and so on.
Aluminum alloy doors and windows hardware accessories can directly affect the service life of doors and windows
Aluminum alloy doors and windows installation standards:
1. After the aluminum alloy sliding door and window are installed and fixed on the door and window frame, the door and window sash with good glass will be integrated into the chute in the frame, and the gap between the fan and the fan can be adjusted.
2, aluminum alloy flat doors and windows in the frame and the fan grid assembly on the wall, install and fix the glass after the installation, that is, first adjust the frame and the fan gap, then the glass into the fan and adjust the position, later inlaid seal Strips and sealants.