Yuba installation detailed analysis details analysis reveals the decoration puzzle

Nowadays, most of the bathrooms are equipped with integrated ceilings, convenient installation and multi-functional and practical layout, so that the bathroom space is more and more unrestricted. The function of Yuba is that many people only focus on keeping warm, but in fact, the function of Yuba has gradually become more diversified in function, and the various functions such as air-heating Yuba and lamp-heating Yuba have made our bathroom space become like spring, and then Don't worry about freezing when you take a shower. So do you really know the details of Yuba? The installation steps are crucial for the service life of Yuba.

1, Yuba corner installation

The edge strip should be installed flat and firm, determine the installation height, and draw a horizontal line. After the tiles are properly placed, in the horizontal situation, the matching corner lines of the ceiling are integrated and tightly fixed on the tiles, so that there is no obvious gap.

2, Yuba and keel installation

The lower boom and the light steel keel are placed, and the distance between the boom and the keel is the same as the panel size. At the top, the expansion eye is fixed and all the booms are fixed. The lower mouth of the boom is connected with the hook. The ceiling is then fixed in the middle of the hook and the height of the nut is adjusted to make the plane plane of the main keel from the plane line on the edge strip. 75px and fastened.

3, exhaust pipe docking

According to the actual installation length minus 5mm, take the required keel, put on the triangular hanging piece, and temporarily suspend all the keel with the triangular hanging piece on the main keel according to the drawings.

4, the installation of the gusset

Wear clean gloves and install the gussets to take into account the overall aesthetics and bilateral symmetry.

[Cutting method]: Fix the template, and use a utility knife and a ruler to describe it more than three times. Cut the edge with a scissors to cut it into a 90-degree angle and fold it 2-3 times by hand. The corresponding surface of the template cutting opening is stuck in the keel, the cutting surface is placed on the edge strip, and the edge strip is pulled out to clamp the template. At this time, the triangular lifting piece can be clamped with the steel tongs and the main keel. .

When the middle part template is installed, the two corresponding faces of the template are respectively stuck in the keel, and the gap between the templates is controlled to maintain the straight line of the seam. Note: After completing the installation of each row of templates, the triangular lifting pieces should be clamped with the steel tongs and the main keel.

5, the installation of the host

When the design of the heating type host is encountered according to the drawing design, the integrated ceiling net replaces the template with the host panel to confirm the accurate installation position of the host; then the main box is placed above the keel. Install (embed) the electrical appliance, and make the panel and electrical interface flat and seamless.

Wrought Iron Gates

Iron Fence Gate,Wrought Iron Gates,Iron Gate,Forged Iron Gates

Ming Yi iron arts company , https://www.mingyi-ironware.com