Speaking of the order of house decoration, you may also be able to say one, two, three, but it is estimated that the details can be traced to the details. Not to mention that the formal decoration process has thousands of procedures. It is also very difficult to ensure that each process does not have problems. thing. In fact, we do not pay much attention to the decoration process, only focus on how to shorten the construction period of the house decoration.
Without saying anything else, let me take the example of my neighbor's house. The neighbor started renovations in January. It is expected that the renovations will be completed in April and stay in July for three months. It happens that her little grandson is going to a nearby elementary school in September. The plan is good. But the process of decoration is twists and turns, why? Just because the workers did not grasp the order of house decoration, the construction period was extended for a full three months.
Don't worry, let's take a look at the formal house decoration sequence and time-consuming.
Early-stage apartment adjustment and wall removal projects
Duration: 2-3 days
As long as it is not a load-bearing wall, wall reconstruction can be carried out. This project is quite huge in the renovation of old houses.
In addition, owners who pay attention to feng shui will also consider the feng shui factors and make slight changes to make feng shui better.
The convenience and comfort of the modified apartment are greatly improved. If the workers move fast, most of them can finish the wall within two days.
Demolition and modification generally includes wall demolition, wall stacking, demolition of bay windowsills, and stacking bay windowsills.
It takes about 1-2 days to dismantle and modify the apartment of about 100 square meters, and it will take about 2-3 days to change the concrete wall. If this item is not modified at home, you can subtract this time.
Fast completion of the small tip:
The early stage of this stage is very important. It is necessary to quickly determine the plan for changing the apartment type, and never drag the mud and water during construction.
Hydropower retrofit installation
Duration: 5-10 days
The content of hydropower transformation includes slotting, wiring, piping, acceptance, etc., which are inseparable from the construction design drawings and may be modified and adjusted according to the structure of the wall.
According to the complexity of the project, the construction period is about 5-10 days, and the route arrangement is adjusted according to the size of the house.
After the electrician enters the field, you can ask the electrician to write a list of switch panels and lights. You can participate in some preferential activities as soon as possible!
Masonry works, including tube wrapping, waterproofing, tiling, etc.
Fast completion of the small tip:
When changing the apartment type, the owner should determine the various materials used in the hydropower transformation to avoid temporary errors. This step is especially important in the house decoration sequence.
Mud Tile Engineering
Duration: 10-15 days
The mud and tile project is waterproof and tiling.
Waterproofing should be based on the size of the kitchen and bathroom area, usage habits, waterproof height, etc., plus a closed water test after the water is released. The time is another 2 days. (The closed water experiment and tiling in other spaces can be carried out simultaneously)
The complexity of tiling of tiles is related to whether it is necessary to cut the pair of flowers, etc., so the time spent varies. Infrared positioning is also required before paving, and it must be dry after paving. The general time is about 15 days.
Fast completion of the small tip:
After the mason enters the site, when doing waterproofing, it is necessary to open a list of tiles. The tiles should be entered within 2 days after the mason enters the site. It is best to avoid delaying the construction period because of your own reasons! ! !
Woodwork, including suspended ceiling, background wall, on-site cabinets, etc.
Duration: 10-15 days
Carpentry is mainly suspended ceilings, custom-made furniture, wooden background walls and so on. There is also a month long. Of course, if you choose all the finished furniture and wood work items, the time will be much shorter.
Fast completion of the small tip:
When it comes to carpentry engineering, basically everything in the family can be seen as soon as possible to see the model, such as toilet, bathroom, smoke stove, hardware, etc., start early, so as not to be caught by surprise when you want to use!
Paint works, including wall paint and furniture paint on site
Duration: At least 15 days
The paint project mainly refers to the painting of walls, ceilings, wallpapering, etc. You must wait for the putty to dry before painting, and each time it must be completely dry before the next process can be carried out. So this one also takes time!
After the completion of some defects, you need to polish and dry. The shortest construction period is about 15 days.
Fast completion of the small tip:
Purchasing paint is also a major project, and other tasks such as wallpaper purchase must also be efficiently solved.
Installation works, including hardware sanitary ware, lamps, etc.
Duration: 5-7 days
It ’s up to you to control one by one. You ’ve got all the things, and the installation is relatively fast. I ’m afraid I ’m going to get this one today, and I ’ll install one tomorrow. I bought it back, be careful not to buy the wrong size!
According to this calculation, it is almost two and a half months. This is the normal construction time of a flat of about 100 square meters. Of course, it is not so ideal under normal circumstances. When there is a connection between different types of work, there may be a 1-2 day shutdown. , Also considered normal.
In addition, if your main material is not purchased in time, it may delay some time, so normal home improvement, the entire cycle is relatively normal within 3 months, try to agree on the decoration time in the contract, and then pay attention to each purchase in advance. The main material to be used to avoid the delay in construction due to your own reasons!
The fastest home improvement I've seen is a good friend's house. The marriage date is fixed and the decoration time is very small. In this case, their family found a large number of workers to work on shifts. The entire home decoration was completed in just one month. Not very fast? ? Of course, there will be a lot of extra work costs, and double workers will certainly pay twice as much. If it is used for emergency, you can also try this method.
Summary: After reading so much knowledge about the order of house decoration and understanding the duration of related procedures, are you more confident in the decoration?
What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount
Silica black is the general name of white powder X-ray amorphous silica and silicate products, mainly refers to precipitated silicon dioxide, gas phase silicon dioxide and ultra-fine silicon dioxide gel, including powder synthesis of aluminum silicate and calcium silicate, etc. Silica is porous and its composition can be expressed as SiO2·nH2O, where nH2O is in the form of surface hydroxyl groups. Soluble in caustic soda and hydrofluoric acid, insoluble in water, solvents and acids (except hydrofluoric acid). High temperature resistance, non-combustion, tasteless, odorless, with good electrical insulation.
Imported Premium White Carbon Black
Imported Premium White Carbon Black,Special Auxiliaries For Thermoplastics,Surface Modification Treatment,Premium White Carbon Black
Xingbang High Molecular Materials Co., Ltd. , https://www.chemicaladditive.com