Since smart building intercom systems are gradually moving towards digital applications, many engineering companies must incorporate the access control systems of various brands into the door-to-door and system cabling integration. Therefore, the networking of the system must take into account the interconnection of the intercom and the access control system. Line layout and signal transmission. The design of the network integrated cabling project has a decisive influence on the process of wiring the intelligent building intercom system, and should be carried out with caution in construction design and installation projects. Usually, after the construction planning of the intelligent building intercom system is completed, the next step is the installation and implementation of the project. The most important task before construction is the project preparation work. These tasks and precautions include the following.
1, master and fully understand the wiring construction drawings, determine the location of the wiring, need to consider such as aesthetics and concealment, the destruction of the building must be reduced to a minimum, in the cloth to avoid power lines and other communication lines to avoid interference and string In the case of information, at the same time, necessary protection measures must be taken for the cables. At the same time, it is necessary to assess the feasibility of installation and wiring before installation, especially for projects such as wall piers and truss columns, etc.; And so on, construction personnel, supervisors and supervisors perform.
2, careful calculation of material requirements, in the final worksheet to do a good job in calculation of materials and labor, comprehensive consideration of the design and implementation of the management operations and other costs proposed budget and duration and construction programs and arrangements. The degree of cooperation of the user needs to be considered in the implementation plan. The implementation plan needs to negotiate the approval signature with the user and specify the coordinating responsible person to designate the person in charge of the project and the project supervision personnel to be responsible for planning the preparation of materials, preparation of the work, and the user's request for cooperation.
3. Intelligent building intercom network engineering requires many construction materials in the construction process. Some of these materials must be prepared before starting work, and some can be stocked during the start-up process. These materials mainly include optical cables, UTP twisted pairs, and RJ. Sockets, signal control modules, servers, power supplies, HUB hubs, etc., and determine the date of delivery, different specifications of PVC fire protection pipe, winding pipe, screws and other materials in place, will do a good job construction equipment and equipment safety measures , Formulate construction schedule.
4, planning and design of intercom system should first pay attention to standard specifications. The design of the wiring must be done to meet the needs of the users, and at the same time, the construction cost must be met. Strict standards have clear rules for the structured cabling system to achieve engineering requirements and technical pointers.
5, intelligent building intercom system must be based on the actual situation. The layout of the layout of the design in addition to the direct impact on the construction costs, but also related to whether the network cabling is reasonable, for a multi-storey building, the installation of the entire building network backbone switch information center network room, preferably installed in the building In the middle floor, if the wiring closet is set on each floor, it is better to set it on the middle section of the floor. This design can not only shorten the wiring length of vertical and horizontal trunk subsystems, save materials, reduce costs, but also reduce unnecessary channel transmission. Distance and material waste.
6. It is necessary to promptly deal with various situations occurring in the construction process and coordinate the handling of opinions from all parties. If on-site construction encounters unforeseen problems, it shall promptly report to the engineering unit Yuanyuan and propose solutions for the engineering unit Yuanyuan. Study and solve the problem on the spot so as not to affect the progress of the project.
1, master and fully understand the wiring construction drawings, determine the location of the wiring, need to consider such as aesthetics and concealment, the destruction of the building must be reduced to a minimum, in the cloth to avoid power lines and other communication lines to avoid interference and string In the case of information, at the same time, necessary protection measures must be taken for the cables. At the same time, it is necessary to assess the feasibility of installation and wiring before installation, especially for projects such as wall piers and truss columns, etc.; And so on, construction personnel, supervisors and supervisors perform.
2, careful calculation of material requirements, in the final worksheet to do a good job in calculation of materials and labor, comprehensive consideration of the design and implementation of the management operations and other costs proposed budget and duration and construction programs and arrangements. The degree of cooperation of the user needs to be considered in the implementation plan. The implementation plan needs to negotiate the approval signature with the user and specify the coordinating responsible person to designate the person in charge of the project and the project supervision personnel to be responsible for planning the preparation of materials, preparation of the work, and the user's request for cooperation.
3. Intelligent building intercom network engineering requires many construction materials in the construction process. Some of these materials must be prepared before starting work, and some can be stocked during the start-up process. These materials mainly include optical cables, UTP twisted pairs, and RJ. Sockets, signal control modules, servers, power supplies, HUB hubs, etc., and determine the date of delivery, different specifications of PVC fire protection pipe, winding pipe, screws and other materials in place, will do a good job construction equipment and equipment safety measures , Formulate construction schedule.
4, planning and design of intercom system should first pay attention to standard specifications. The design of the wiring must be done to meet the needs of the users, and at the same time, the construction cost must be met. Strict standards have clear rules for the structured cabling system to achieve engineering requirements and technical pointers.
5, intelligent building intercom system must be based on the actual situation. The layout of the layout of the design in addition to the direct impact on the construction costs, but also related to whether the network cabling is reasonable, for a multi-storey building, the installation of the entire building network backbone switch information center network room, preferably installed in the building In the middle floor, if the wiring closet is set on each floor, it is better to set it on the middle section of the floor. This design can not only shorten the wiring length of vertical and horizontal trunk subsystems, save materials, reduce costs, but also reduce unnecessary channel transmission. Distance and material waste.
6. It is necessary to promptly deal with various situations occurring in the construction process and coordinate the handling of opinions from all parties. If on-site construction encounters unforeseen problems, it shall promptly report to the engineering unit Yuanyuan and propose solutions for the engineering unit Yuanyuan. Study and solve the problem on the spot so as not to affect the progress of the project.
It is a hand wrapped heat Shrinkable Tape designed for corrosion protection of straight pipes, fittings, bends, elbows and other irregular configurations.. When heated the backing layer shrinks and the adhesive flows and forms a reliable corrosion protection seal onto metal and adjacent coating surfaces.The Polyethylene Heat shrinkable Tape needs no primer nor patch closure and reduces application time and labour costs.
Polyken Hot Applied Shrinkable Tape
Polyken Hot Applied Shrinkable Tape,Hot Applied Shrinkable Tape,Shrinkable Tape,Shrinkable Insulation Tape
Jining Qiangke Pipe Anticorrosion Materials CO.,Ltd , https://www.pipe-wrap-tape.com