Heating cable heating system installation process introduction

Heating cable heating system installation procedures:

1. Check the paving area to confirm that it meets the construction conditions.
2, clear the paving area.
3, laying thermal insulation layer.
4, laying reflective layer.
5, laying steel mesh.
6. Lay fixed heating cables according to design drawings.
7. Detect the nominal resistance and insulation resistance of the heating cable.
8, according to the requirements of pouring concrete filling layer (by the construction and decoration team to complete).
9. Detect the nominal resistance and insulation resistance of the heating cable.
10. Install a warm thermostat.
11. Lay the ground decoration materials and complete the ground construction (completed by the construction and decoration team).