Five steps for home decoration acceptance

Five steps for home decoration acceptance, creating a perfect acceptance process. The owner can grasp the progress during the renovation process and carry out inspections in stages. This will not only avoid the pain of going back and forth, but also control the construction quality.

1, before entering the market

Whether the demolished and reformed project meets the requirements of the contract, whether there is a hidden safety hazard, whether the wall surface treatment is clean, and whether the quantity, grade, and specifications of the incoming material are in agreement with the prior agreement.

2, water circuit

The acceptance of the second stage should be a single acceptance of the waterway and circuit transformation. Consumers should check whether all the transformation lines are unobstructed, whether the layout is reasonable, whether the operation is normal, and reconfirm the line transformation under the operation of a professional hydraulic or electrician. Actual size. Only after the line is changed, the putty worker can continue to seal the wall and putty.

3, carpentry work size

The third acceptance must be done after the carpentry foundation. At this time, ceilings and plaster lines in the room should also be completed. Wall tiles in the kitchen and bathroom are already attached. At the same time, the painted wall should be scraped twice. Putty. Acceptance work at this stage is very important, consumers should carefully check the drawings, confirm the size of the parts, such as found inconsistent place, promptly prompt the construction team to modify.

4, woodworking work quality

When all the fine wood products are finished with a veneer and the wooden thread is nailed, the consumer can perform the fourth stage of acceptance. This time is basically half of the time, the inspection of this stage should focus on the color and texture of wood products and large areas of flatness and gaps are uniform.

After the completion of wood products, oil workers can start the primer treatment work, and all floor tiles should also be posted in this stage, which is the fifth stage in the phased acceptance.

5, after completion

The final phase of acceptance is the most comprehensive and thorough. Consumers are required to check the installation of footboards, sanitary ware and hardware, whether the finish of wooden products is in place, whether the paint on the wall or top surface is uniform, whether the panel of the electrician is properly installed and the position of the light fixture, and whether the circuit connection is correct. In addition, consumers should require the construction team to clean the room thoroughly before moving back.

Entrance decoration decoration company room paint home home decoration paint bathroom ceiling material bathroom ceiling bathroom floor tile bathroom size decoration home

Ceramic Cutting Disc

Ceramic Cutting Disc,Ceramic Tile Cutting Disc,Grinding Wheel For Ceramic Tile,Ceramic Grinder Blade

Hengshi Diamond Tools CO.,LTD , https://www.ryomaltools.com