When it comes to renovation, the first thing to do is to choose a decoration. There are three types of decoration, including clear, half and full packages. Each of the three decoration methods has its own advantages and disadvantages. It is right to choose the right one for you. In this case, clearing the package should require the owner to invest the most time and effort. Here's what you need to pay attention to clarifying the packaging.
First, whether the project is subcontracted
After some decoration companies signed with the owners, they went to find some "road guerrillas" for the owners to decorate. After the subcontracting, the engineering team responsible for the construction is even less profitable. If profits are to be obtained, it will only harm the interests of the owners.
Second, the wall paint
If the workers are not serious or perfunctory during construction, small color differences often occur. Before using latex paint, some water must be added, and latex paint must be used up once. Paints of the same color are also best painted once. If the wall needs to be repaired after construction, the whole wall should be repainted again.
Third, the sewage pipeline
When carrying out renovations, the construction team sometimes dumps construction waste into the sewers in order to save time. As a result, the sewers were severely congested, causing the kitchen and toilet to run out of water due to poor water. After the construction of the waterway is completed, all the basins, basins and bathtubs are filled with water, and then the water is discharged at the same time to see if the water is unobstructed and if there is any leakage of the pipeline.
Fourth, wire connector
When installing electric sockets, switches and lamps, electricians do not wire according to construction requirements. After all the switches and sockets are installed, be sure to actually use them to see if any of these parts are hot.
Fifth, seam modification
In some places where the wall meets the door and the window, and where the two different colors of paint meet, it is also the place where the workers often perfunctory. The processing of seams is very important. If there are two colors of paint on the wall opposite to each other, in the construction must be taped on the edge of the first color, and then painted on another color paint, tear off after the completion of the construction Take the tape.
Six, wire wear tube
In home renovation construction, almost all wires are put in PVC pipes and buried in the walls. Therefore, after the electric wire is put into the PVC pipe, the consumers cannot see it at all and it is difficult to replace it. How to save money for decoration? On the home improvement network, free design budget quotes. If the worker is not careful in the operation, it will cause the wire to kink in the tube, causing electricity hazards. If the workers intentionally cut corners, they would use wire with connectors or put several wires in the same PVC pipe. It is best for consumers to buy the wires themselves and then supervise the workers' operations at the site. After the installation is complete, check the power supply. In addition, consumers must allow the decoration team to leave a "pipeline map."
Seven, facet processing
The so-called “small face†is a small place that some consumers can't see and can't pay much attention to, such as the upper edge of the door, the underside of the window sill, and the inside of the heating cover. Some workers will cut corners here. Even without any treatment. Remember that there are 6 planes for any object. Don't ignore any details when checking the quality of the project.
Eight, ground leveling
If the workers are not careful or intentionally sloppy, it will cause the problem of “more and more unevennessâ€, and the cement mortar used in construction will also greatly increase the ground load, causing hidden dangers to the safety of the building. Before ground leveling, ground surface treatment must be done first, and then cement mortar should be used to level the ground. After the cement is dry, determine the flatness of the entire floor using a dedicated level ruler, and then proceed to the next step.
Nine, substrate processing
Some workers cut corners during the construction period, but the unevenness caused the wall surface to be uneven. After the latex paint is applied, there is a color difference. When the paint is applied, the latex paint is discolored and peeled, or the ceramic tile is not stuck firmly. In the paving construction of tiles, tiles cannot be laid directly on the surface of lime mortar, lime paste, lime paste, hemp plaster and latex paint, but the base layer must be cleaned before being laid. The adhesive paste used between the ceramic tile and the base shall be formulated in strict accordance with the construction standards and proportions, and the specified grades of cement and adhesive glue shall be used, and they shall not be randomly deployed.