[China Aluminum] In the construction and decoration project, the use of aluminum profiles for the production of doors and windows is relatively common. Although the size and style of aluminum alloy swing doors are different, the construction method and production and installation methods of aluminum alloy swing doors are similar. Today, we will introduce the installation method of aluminum alloy swing doors. If you are close to just installing the aluminum alloy swing doors, then come and see!
The main constituent material of aluminum alloy swing door 1. Frame part: Frame profile and door frames for door frames.
2, swing door hardware: door handle, fastening parts and so on.
3, door frames and wall connections: aluminum angle of about 2 mm thick profile, but also the need for specific specifications of the screw.
4. Swing door glass: It is better to use 3 mm thick double glass.
Introduction of Installation Method for Aluminum Alloy Swing Doors When we have prepared the above materials, we can begin to install the door. First of all, we use the bullet line to find the rules, and then deal with the opening of the door, and then find the buried connection in the hole. Iron pieces. At this point, we will open the purchased aluminum alloy swing door and carry out unpacking inspection. We will place it in the required location according to the drawing number. After that, we inspected the protective film of the aluminum alloy to see if it had been punctured. Then we installed the aluminum alloy door. At this time, some insulation materials were filled in the caulking around the door and the clean debris was cleaned. After that, we installed hardware fittings on the aluminum alloy swing doors, and then installed the door seals. If there are other needs, we can also install the glass. Here, Xiao Bian gives you a detailed description of the installation position of the wall thickness. The better installation position is based on the size of the drawings and the width of the platen. If there is a deviation, the principle is to expose the sill plate. The same size.
Anti-corrosion treatment of aluminum alloy swing door If the aluminum alloy swing door is installed with iron pieces fixed, anti-corrosion treatment is required. The connection piece preferably uses stainless steel texture. Secondly, the anti-corrosion treatment on the sides of aluminum alloy swing door frames should be handled in accordance with the requirements of the design. If there is no design requirement, anti-corrosion materials should be applied, and rubber-type materials, etc., can be used.
Having said so much, I believe we already know about the installation of aluminum alloy swing doors. Don't forget to check whether the hardware is connected with the aluminum alloy swing door after the installation of the door. If allowed, we must do the work of fixing the wall.

Reaction Frame

The function of the reaction frame is to transmit force. Go to the floor and use it to test samples with hydraulic actuators. The size of the reaction frame or part of this frame will be used for most major experiments in the laboratory. Because the geometry of future experiments is unknown, the reaction frame has been designed as a reconfigurable frame that can apply forces at different height levels or vertically from above.

Reaction Frame,Reaction Frame Structure,Shield Auxiliary Reaction Frame,Subway Reaction Frame

Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com