Winter home decoration attention to small details to avoid big trouble construction more at ease

Trap 1 : The construction process does not tell you clearly that he is trying to cut corners
Crack: Say Nothing to Write on the Contract

Trap 2: Make money directly from the unit area
Crack: All areas are measured by themselves

Trap 3: Quotes move back and forth every time
Crack: Personally compare and check the corresponding clauses

Pitfall 4: Material is poor when approaching
Crack: Bring the contract and quotation together with supervision

Trap 5: Advanced Materials Make You Acceptable to Defraud
Crack: From time to time on the site, to avoid the decoration of the foreman to find out the law of your time

Pitfall 6: The worker does not have a job permit
Crack: Be sure to ask professional workers to do professional things

Trap 8: Decoration companies always persuade owners to do more woodworking
Crack: Ask experienced person to help you see the quotation

Pitfall 7: Foreman lets you increase project budget at random
Crack: The industry insists on principles Do not be too soft

Trap 9: Workers will send you to buy this
Crack: It is best to leave an invoice or receipt after each purchase

Trap 10: Arbitrarily selling so-called "waste" without owner's consent
Crack: It is a rule to sell something and the owner must say hello

Trap 11: Decoration company advances to medium term
When signing a contract, it is best to limit the foreman through money.

Pitfall 12: Destroying the homeowner's Home Furnishing Alliance
First of all, the principle of unification of the family in the decoration

Entrance decoration restaurant decoration decoration company

Air Supply System

Air supply system for the spray paint room operating area by the temperature, humidity, filter clean fresh air equipment. The amount of air flow depends on the size of the wind in the painting room. The size, temperature, humidity and dust removal of the painting room depend on the type of paint sprayed, the appearance quality of the coating and the working environment of the operator. Paint room Typical air conditioning air supply system: bird fence (air inlet) → suction adjustment blinds → pre (early) filter → preheater → washing section and retaining plate → after heater → fan → after filter → Muffler → air conditioning shutters. According to the different needs of users, air conditioning system can have more than the composition of different segments. They are installed in a channel-type body made of galvanized steel. Because the air volume is bigger, only has the heating heating function, because the summer reduces the temperature to consume the energy and the investment is big, generally does not have the cooling device, does not have the cooling function. Heating heat source for hot water, steam, electricity, fuel oil, thermal oil, natural gas. In the northern winter, the outdoor temperature dropped to -20 ℃ the following occasions, can be installed in the suction nozzle of natural gas combustion, direct heating, sandstorms in the large area of the inlet can be added sand filter. In the south, the green environment is good, less sand and high humidity occasions, in order to save investment, can be saved washed section. Water section of the sink, wall panels made of stainless steel, the supply of water quality is better. In the filter before and after the general installation of a pressure gauge, when the pressure reaches a certain value should be replaced when the filter element. The filter element is made of a non-woven filter material. Generally from the plant outside the suction, suction outlet in the strong wind when the sand and dusty places, away from the paint room exhaust outlet a little farther or in the wind at the side, the suction outlet should be installed metal mesh or fence to prevent inhalation of birds . In order to prevent the fan noise into the paint room, in the fan after the air duct should be muffler.

Fan size According to the size of the spray booth and the number of ventilation to determine the number of hours of air supply unit for the spray booth hours per hour and the volume of indoor ventilation product. Temperature, humidity and degree of dust removal depends on the spray paint varieties, coating quality requirements and appearance of the operator's operating environment.


Air Supply System,Fresh Air Supply System,Low Voltage Air Supply System,High Strength Air Supply System

Shenzhen Heng Yi Jia Technology Co., Ltd. , https://www.spraycoatingline.com