| Trap 1 : The construction process does not tell you clearly that he is trying to cut corners |
| Crack: Say Nothing to Write on the Contract |
| Trap 2: Make money directly from the unit area |
| Crack: All areas are measured by themselves |
| Trap 3: Quotes move back and forth every time |
| Crack: Personally compare and check the corresponding clauses |
| Pitfall 4: Material is poor when approaching |
| Crack: Bring the contract and quotation together with supervision |
| Trap 5: Advanced Materials Make You Acceptable to Defraud |
| Crack: From time to time on the site, to avoid the decoration of the foreman to find out the law of your time |
| Pitfall 6: The worker does not have a job permit |
| Crack: Be sure to ask professional workers to do professional things |
| Trap 8: Decoration companies always persuade owners to do more woodworking |
| Crack: Ask experienced person to help you see the quotation |
| Pitfall 7: Foreman lets you increase project budget at random |
| Crack: The industry insists on principles Do not be too soft |
| Trap 9: Workers will send you to buy this |
| Crack: It is best to leave an invoice or receipt after each purchase |
| Trap 10: Arbitrarily selling so-called "waste" without owner's consent |
| Crack: It is a rule to sell something and the owner must say hello |
| Trap 11: Decoration company advances to medium term |
| When signing a contract, it is best to limit the foreman through money. |
| Pitfall 12: Destroying the homeowner's Home Furnishing Alliance |
| First of all, the principle of unification of the family in the decoration |
Entrance decoration restaurant decoration decoration company
Air Supply System
Air supply system for the spray paint room operating area by the temperature, humidity, filter clean fresh air equipment. The amount of air flow depends on the size of the wind in the painting room. The size, temperature, humidity and dust removal of the painting room depend on the type of paint sprayed, the appearance quality of the coating and the working environment of the operator. Paint room Typical air conditioning air supply system: bird fence (air inlet) → suction adjustment blinds → pre (early) filter → preheater → washing section and retaining plate → after heater → fan → after filter → Muffler → air conditioning shutters. According to the different needs of users, air conditioning system can have more than the composition of different segments. They are installed in a channel-type body made of galvanized steel. Because the air volume is bigger, only has the heating heating function, because the summer reduces the temperature to consume the energy and the investment is big, generally does not have the cooling device, does not have the cooling function. Heating heat source for hot water, steam, electricity, fuel oil, thermal oil, natural gas. In the northern winter, the outdoor temperature dropped to -20 ℃ the following occasions, can be installed in the suction nozzle of natural gas combustion, direct heating, sandstorms in the large area of the inlet can be added sand filter. In the south, the green environment is good, less sand and high humidity occasions, in order to save investment, can be saved washed section. Water section of the sink, wall panels made of stainless steel, the supply of water quality is better. In the filter before and after the general installation of a pressure gauge, when the pressure reaches a certain value should be replaced when the filter element. The filter element is made of a non-woven filter material. Generally from the plant outside the suction, suction outlet in the strong wind when the sand and dusty places, away from the paint room exhaust outlet a little farther or in the wind at the side, the suction outlet should be installed metal mesh or fence to prevent inhalation of birds . In order to prevent the fan noise into the paint room, in the fan after the air duct should be muffler.
Fan size According to the size of the spray booth and the number of ventilation to determine the number of hours of air supply unit for the spray booth hours per hour and the volume of indoor ventilation product. Temperature, humidity and degree of dust removal depends on the spray paint varieties, coating quality requirements and appearance of the operator's operating environment.
Air Supply System,Fresh Air Supply System,Low Voltage Air Supply System,High Strength Air Supply System
Shenzhen Heng Yi Jia Technology Co., Ltd. , https://www.spraycoatingline.com