Home decoration is very important. Before the construction, the owner must sign the contract. When signing the contract, the following items should be noted.


Silver Crystal Bathroom Cabinet

Home decoration, the owner must sign the contract before the construction, when signing the contract, pay attention to matters:

1. Make full preparations. In the signing of the contract between the two parties, it is best to attach one item. If Party A is not satisfied with the construction of the decoration team, it may terminate the contract within ten days from the date of construction.

2. Before signing the contract, it is necessary to check whether the business license of Party B was issued by the State Administration for Industry and Commerce.

3. In order to avoid losses on materials, it is necessary to specify in the contract which part to use.

4. The payment method should be indicated in the contract, preferably by installment payment method. That is, after the contract is signed, 30% will be paid, and 50% will be paid in mid-term. After the contract is accepted, it will be paid.

5. Duties and Obligations of the Parties in the Contract: During the construction, the construction party is responsible for following the customer's requirements. The midway cannot be changed without reason, and the customer is also obliged to provide the construction party with conditions such as water and electricity.

6. The construction period is pre-arranged by both parties. Due to delays due to the construction side, the construction party shall be responsible for the delay. If the customer has special reasons or natural reasons, the construction period shall be postponed, but a temporary change agreement shall be signed with the construction party. .

7. At the end of the project, it is indispensable for the acceptance during the construction process. There should be procedures for acceptance or not, and no agreement should be made. The official seal of Party B should be attached to the formalities, not just the representative's signature.

8. In order to prevent the appearance of breach of contract during construction, the signing of the contract should not only be to write "cooperation between the parties" but should be indicated to the local court or consumer association.

9. It is necessary to sign a safe production and fire prevention agreement with Party B. If Party B has violated the regulations during the operation, Party A cannot condone and the problem should be promptly stopped. Pay attention to the "hidden murder" clause. For example, the contract is written for a period of 50 working days. However, if B wants to come for a day, they will do it. If they do not want to come, they will not come. Then when they can get 50 days, they should indicate that they will finish work on a particular day, such as a certain year. The contract is written on the interior wall finishes, no branding is indicated, and Party B can use ordinary interior paints instead of advanced interior paints.

10. Pay attention to the "hidden murder" clause. For example, the contract is written for a period of 50 working days. However, if B wants to come for a day, they will do it. If they do not want to come, they will not come. Then when they can get 50 days, they should indicate that they will finish work on a particular day, such as a certain year. The contract is written on the interior wall finishes, no branding is indicated, and Party B can use ordinary interior paints instead of advanced interior paints.

11. The loss of general materials should be less than 5%. Some construction teams do not pay attention to the material savings, chaos and chaos, resulting in considerable loss of materials, so when signing a contract, it should be agreed in the remarks column. Note: If Party B’s material loss during the construction process exceeds 5%, Party B’s losses shall be borne by Party B.

Decoration contract entrance decoration restaurant decoration paint home decoration bathroom

Wire Braided Hydraulic Hose

Wire Braided Hydraulic Hose,Braided Wire Hydraulic Hose Cutter,Steel Wire Braided Hydraulic Rubber Hose,Rubber Tube, Pipe & Hose

Rubber Tube, Pipe & Hose Co., Lt d , http://www.nbhoses.com