Processing LDPE.HDPE.PP.PVC.PaPE.PET primary film material, when rolling material:
For some raw materials that can be directly put on the machine, be sure to pay attention to the cleanliness of the site during loading and unloading. The aging or stained materials are opened to the secondary materials. These materials are not washed by water as much as possible. Keep the workplace clean and gloved, both for worker protection and to avoid yellowing of particles!
Led Down Light,Ceiling Down Light,Ceiling Led Down Light,Cob Led Downlight
JIANGMEN MICHEN LIGHTING CO.,LTD , https://www.jmmission.com