Netizens Weapons: How to conduct construction acceptance

>>> Qi family classroom: home decoration bad project again big exposure

There are many places that should be noticed during acceptance, including quality acceptance, acceptance of supporting facilities, and some details including the handling of accessories.

First of all, do a good job of quality inspection after renovation.

This mainly includes the acceptance of concealed works, carpentry, paint, metal and some miscellaneous items. Among the points to note are:

Water pipes can be made of copper pipes, hot water is covered with plastic copper pipes, water is used with PVC pipes, and the interface is made of waterproof adhesive tape. The installation leader must use cloth tools. Do not break the faucets and accessories. The floor should be smooth and no pits or scratches can occur. The bottom of the board should be placed with plastic film, and the four sides should be reserved. The tiles should be set flat, the angle should be accurate, the interface should be on the line, the toilet floor should have slopes, no water can be accumulated, and the tile interface should be cleaned with rattan silk after wiping the cement. White cement, can not be stained on the top; paint the surface color is uniform, no tears, through the bottom, bubbles and other phenomena; board and board, board and wall interface should be affixed after the tape ash; latex paint in the distance from the point of view, should No trace marks.

The concealed projects mainly include the following items, including whether the water supply of the water pipes is unimpeded, whether the lighting and the sockets are normal, whether the television and telephone signals are normal, whether the network lines are normal and the waterproof conditions of the ground. The acceptance of miscellaneous items includes: in accordance with the provisions of the contract item, whether or not the project items are all completed; whether the luminaires are all on, and whether sanitary fittings and other installation products are installed accurately.

Second, we must do a good job after the decoration of the aesthetic acceptance.

This mainly includes the matching facilities of the living room and whether the color matches the overall style. Among them, the supporting facilities in the room mainly refer to whether the furniture, sanitary ware, cabinets, lamps, bathroom facilities, etc., are the same as the overall style of the living room.

The color acceptance includes whether the color of each space, such as bedroom, kitchen, living room, and bathroom, is the same as the main color of the living room. Because color is the first impression of a home, it is recommended to listen to the designer's suggestions in this regard because they have overall confidence in the design.

Third, we must handle the details of the renovation.

If there is no problem with the general condition of home decoration, then it is also necessary to carefully examine some details at this time. For example, the door handle of furniture, its shape and color with the furniture and living room with. In addition, there are hanging rings for curtains in the living room and bedroom, garbage disposal in the living room and kitchen.

Construction Acceptance Paint Furniture Decoration Design Cement Style Decoration Decoration Living Room Decoration Style Floor Tile Toilet Door Cabinet Door Kitchen Cabinet Door Bathroom Tile Toilet Door Bathroom Tile Color Integral Toilet Bathroom Design Toilet Waterproof Tile Plastic Bedroom Lamp Floor Tile Kitchen Tile Bedroom Lamp

Bathroom hardware set

bathroom hardware sets,bathroom hardware accessories set,bathroom hardware accessories,bathroom hardware accessories set

Guangdong Kinen Sanitary Ware Industrial Co.,Ltd. , https://www.kinengroup.com