It’s a lot of illusion to decorate the house, but because of the reality, for example, there is no time or no technology, so many people give up, but in any case, people who are willing to decorate themselves have completed by decorating their own persistence. What is the decoration process and precautions of your own house? Next, follow the decoration home network Xiaobian to learn about the most detailed decoration process and precautions in history!
House renovation process and precautions
1 pre-design - 2 main body demolition - 3 hydropower transformation - 4 woodworking - 5 tiling - 6 brush wall finish - 7 kitchen and bathroom ceiling - 8 cabinet installation - 9 wooden door installation - 10 floors Installation - 11 shop wallpaper - 12 radiator installation - 13 switch socket installation - 14 lamp installation - 15 hardware and sanitary equipment installation - 16 curtain rod installation - 17 pioneer cleaning - 18 furniture entry - 19 Home appliance installation - 20 home accessories.
1. Pre-design: It is mainly designed according to your own living habits, and a detailed measurement of your room. Don't be lazy. It is best to measure it yourself. The contents of the measurement mainly include: Defining the area involved in the decoration process. Especially the tile area, wall paint area, wallpaper area, floor area; clear the main wall size. In particular, it is necessary to design the wall size of the furniture in the future.
2. The main body is demolished and improved into the construction stage. The main body dismantling is the first project, including demolition, wall building, shovel wall peeling, demolition of heating, plastic steel windows and so on. The main body of the demolition is white, that is, the framework of the construction site is first put together.
3. Before the water and electricity reform water circuit transformation, the main structure demolition should be basically completed. Between the two aspects of hydropower transformation and main body demolition, some students may know that the first measurement of the cabinet should also be carried out. In fact, the so-called cabinet measurement did not have any actual content. Because the wall and the ground were not treated, the cabinet designer could not give the specific design size, but only the water outlet and the hood socket reserved by the developer. Location, make some relevant suggestions.
Mainly include: See if the position of the hood socket affects the installation of the hood later; see if the position of the water meter is suitable; see if the position of the water inlet is convenient for installing the sink later. For the first measurement of the cabinet, a slightly experienced student can do it himself. After the completion of the waterway renovation, it is best to do the waterproofing of the bathroom. The kitchen generally does not need to be waterproof.
4, woodworking carpentry, bricklayers, oilers are the "three brothers" in the construction process, the basic order of appearance is: wood - tile - oil. The basic principle of appearance is - who is dirty and who is first. "Whoever gets dirty first" is also one of the basic principles that determine the order of home improvement, which I will mention later. In fact, woodworking activities such as bag riser, decorative ceiling, plaster line can also be considered as a detailed part of the main body demolition. It does not conflict with the water circuit transformation. Sometimes it needs some Cooperate.
5, the process of tiling in the "Wattong second child" operation, also involves the installation of the following three links: the installation of the door stone, Dali (property) stone window sill. The installation of the stone can be done with the paving slabs. After the paving slabs, the installation of the marble sills is usually done after the window sills are completed. The marble workers will prepare the glass glue and seal the marble and window coverings with glass glue. It is. Installation of floor drains. The floor drain is the first in the home improvement hardware because it is to be installed together with the floor tiles. Therefore, when students start building materials, they should buy floor drains early. The installation of the hood. The range hood is the first to appear in the home appliance. After the kitchen wall and floor tiles are laid, you can consider installing the range hood. "Wattenger second child" leaves the market. At this time, the cabinet can be measured for the second time. To be precise, after the kitchen wall tiles are installed and the hood is installed, the cabinet can be measured for the second time.
6, brush wall paint "oiler third" into the field, mainly to complete the wall surface treatment, brush topcoat, to the "carpentry boss" to play the furniture lacquer and other work. Students who are ready to paste wallpapers only need to let the "oiler's third child" do the grassroots treatment on the wall of the wallpaper. As for whether or not to leave the last coat, I personally feel that this problem is not necessarily too true. From the experience of my decoration, the significance of leaving a top coat is not very big, because the latter operation is no more dirty than painting. .
7. The ceiling of the kitchen and bathroom ceiling cabinets is the first step in the installation process, and it is still continuing the “packaging†of the home. At the same time as the kitchen and bathroom ceiling, the kitchen's moisture-proof ceiling lamps and exhaust fans (Yuba) should have been bought. It is best for students to install the kitchen ceiling lamp and exhaust fan (Yuba) at the same time, or leave the thread and opening.
8. After the ceiling of the kitchen cabinet is installed, it can be installed on the door of the cabinet. If you are successful, you can finish the day. At the same time, there are also sinks (which may not include upper and lower water parts) and gas stoves. Before installing the cabinets, it is best to coordinate the property to pass the gas, because the gas stove needs to be tested after it is installed.
9. The wooden door was installed on the second day of the cabinet installation. As soon as the wooden door was measured more than a month ago, it can now be installed. If it is smooth, it is also the time of day, the hinge, the door lock and the ground suction to be installed at the same time. Students should prepare relevant hardware in advance. If you want the wooden door manufacturer to install the window cover and the cornice, it should be measured together when the wooden door manufacturer measures it, and installed at the same time on the day of the wooden door installation. At the same time, the installation time of the marble window sill should be considered to be wrong, and arranged in the window cover. After installation.
Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period close, it is necessary to let the wooden door manufacturers come to the door to measure the size of the door as soon as possible after the main body is demolished. Regarding the handling of the door opening, everyone needs to pay attention to it. If the height of the door opening in the house is inconsistent, the worker needs to be processed into a contour - good-looking.
10, the floor can be installed on the second day of the installation of the wooden door can be installed, and if it is smooth, it is also a day.
Floor installation needs to pay attention to the following problems: 1. Before installing the floor, it is best to let the factory go to the door to investigate whether the ground needs to be leveled or partially leveled. Some decoration companies or renovation teams will recommend the students to level or partially level the floor, to the floor manufacturers. The actual survey shall prevail; 2. Before the floor is installed, the floor of the pavement floor of the home shall be cleaned to ensure the drying of the ground, so do not use water during the cleaning process; 3. When installing the floor, if there are conditions, the cutting of the floor must be corridor. Previous forums have also discussed this issue. Some students think that it is immoral to cut the floor to pollute public areas in the corridor. My idea is to clean up after finishing, not to tighten. The indoor floor cutting is more serious on the wall. Similarly, there is the cutting of the artificial stone countertops in the cabinet. I believe that the renovated students have some experience.
11, paving the wallpaper on the second day of the installation of the floor, the home cleaned up, you can about the wallpaper paving, and if it is smooth, it is also a day. If there are conditions, the floor should be protected on the day of wallpapering; it doesn't matter if there is no condition. It is no problem to hand over the wallpaper glue left on the floor to the pioneering cleaning. Before laying the wallpaper, try to do "do not have anything" on the wall.
12. The radiator is installed on the second day after the wallpaper is laid. The students who replace the radiator or dismantle the radiator can hang the radiator on the wall. The same is the time of day. Wooden door - floor - wallpaper - radiator, this is a generally accepted correct installation sequence, the first to install the wooden door is to ensure that the baseboard of the floor can be closely engaged with the door of the wooden door; the back of the wallpaper is mainly because of the floor The installation is dirty, dusty, and the wallpaper is seriously polluted. Here again I use the principle of "Who is dirty first?" The final installation of the radiator is because only the wall wallpaper is laid to install the radiator.
13, switch socket installation Students should have a detailed understanding or record of the number and location of the switch sockets in the natural room, especially for the students who paste wallpaper, sometimes the wallpaper workers are irresponsible, the wallpaper is called the shop Go up, he does not use the wallpaper knife to open the hole in the position of your switch socket. Therefore, it is still necessary for the students to know what they are.
14, the lamp installation and installation of lights, nothing to say. After the lights were installed, the home was lit, and the farewell glare of the 100-watt incandescent bulb during the renovation was felt - it felt good.
15, before the installation of hardware and sanitary ware, the upper and lower water pipes, bathroom accessories, toilets, drying racks, etc., are all installed. After the "big pieces" were installed, the home was still very "cool". After the lamps and hardware wares were installed, the house was "live" and really "lived". It is not an exaggeration to say that the first time you open Longshui to watch the water "å“—, å“—" go out, the heart will be beautiful.
16. The installation of the curtain rod installation curtain rod marks the basic end of the home improvement.
17, before the pioneering cleaning and cleaning up, do not install curtains, remember that "interpretation curtains" that reminded everyone. When pioneering cleaning, do not have furniture and unnecessary household appliances at home, try to maintain more "flat", so that the pioneering cleaning can be thoroughly cleaned.
18, furniture approach to the purchase time of furniture, my suggestion is that the earliest should be after the completion of the water circuit transformation, so, the basic size range of the choice of furniture is only in our hearts. Therefore, some students have been eager to order furniture before the renovation has begun. Personal feeling is not necessary.
19, home appliances arrived at this time, the home appliances should enter the market, the installation of the installation, ready to stay!
20, home accessories home accessories, the final step of home improvement, and has been changed from decoration to decoration, including the installation of curtains are part of the home accessories. As for buying curtains, it is best to order furniture to avoid style conflicts. Home accessories also include consideration for buying some green plants, wall paintings, furnishings, and more. In short, after you stay, you are free to play.
The above is a detailed answer to the most detailed decoration process and precautions in history. I don't know if you are satisfied with the introduction of the decoration home network. If you want to know more about the exciting content, please continue to pay attention to our home encyclopedia!
Wear Testing Machine,Gear Wear Testing Machine,Fzg Gear Wear Tester ,Fzg Gear Wear Testing Machine
Jinan Chenda Testing Machine Manufacturing Co., Ltd. , https://www.jncdtester.com