Warm installation precautions

To warm in our lives, that is one of the essential building materials, especially the most widely used in the north . What are the precautions for warm installation ? Next we will take a look at the installation instructions to warm it!

Warm-up Installation Precautions 1. Before Warm-up Installation Preparation Before installing warm floor, a series of work needs to be done to clear the obstacles for the later work. The co-ordination of these jobs generally involves more professional knowledge. It relates to whether the construction conditions of a house are consistent with the installation of floor heating, whether there is a suitable energy supply, and whether the water quality is qualified. Therefore, a professional installation company should be hired to survey if there is any. Where appropriate, corrective measures must be taken before installation of the floor heating, and reasonable design plans should be provided before installation. And there are professional companies to serve you, but also to minimize the occurrence of after-sales problems.

Warm installation considerations 2. Strictly complying with the regulations when installing warmly is a high secret project. Most of the systems are hidden under the ground. Once a problem arises, it is very troublesome to rectify it. Therefore, many jobs must strictly comply with the specifications and be in one step. For example, the laying of coils should pay attention to the distribution interval, to ensure uniform heat dissipation, and the warm pipes at the corners cannot be folded, otherwise there may be blockages or leaks, which require higher construction processes. In order to check the air tightness of the system at any time, the water injection should be checked after the pipeline is installed, and the pressure should be maintained for a long time.

Warming Installation Precautions 3. The floor heating supervisor is responsible for installing the floor heating supervisor to be responsible for the entire floor warm water circulation system. If there is a problem with the floor heating supervisor, it will inevitably affect the normal operation of the entire floor heating system. Supervisors need to do insulation to reduce the amount of heat that hot water emits during the transportation process and ensure the effectiveness of the heating area.

Floor Heating Installation Precautions 4. Distributing Water Installation Divided water collector is responsible for allocating hot water to meet the circulation requirements of the floor heating system. The installation of the water collector must be horizontal, but also pay attention to the connection between the floor heating pipe and the manifold, and no water leakage. In the future, it is easy to debug and overhaul, and the name of the room of each circuit needs to be marked on the manifold.

Warming Installation Precautions 5 , floor heating pipe laying laying warm pipes need to be strictly in accordance with the design drawings, pipeline spacing evenly, and the same diversity of water coil coil length difference does not exceed 20m. When laying floor heating coils, they should be protected and not damaged by heavy objects or sharp objects. The distance between floor heating coils and the wall is about 150mm.

Warm installation precautions 6. If the pipeline pressure maintenance pipeline is damaged, the consequences can be imagined. Therefore, it is necessary to inject the water and pressure after installing the pipeline system and check the airtightness of the system at any time. In the floor heating industry, installation is extremely important. As long as there is no error in the installation process, the floor heating coil and the hot water line are generally the same as the residence. Only the warm installation of each link to complete the specification, users can safely use the floor heating.

Warm installation precautions 7 , floor heating debugging When everything is ready, floor heating commissioning personnel can carry out floor heating commissioning, before commissioning water and gas must be connected, and then follow the system debugging instructions, will perform well. It should be noted that when the equipment is started, it is still not completely sure that the system has been commissioned. The commissioning personnel should stay on site and continue to observe. Until they have confirmed that there are no problems before they can leave, they all require that the technicians have higher professional ethics. And literacy.

With regard to the installation of floor heating , I will introduce it to you in general. I hope to help you, and more information on the decoration is on this site. Please stay tuned.

Warm

Sample Preserving Solution-Inactivated

Sample Preserving Solution-Inactivated,Inactivated Virus Preservation Solution,Sample Preservation Reagent,Coronavirus Preservation Solution

Guangzhou Baybio Bio-tech Co., Ltd , https://www.gzbaybio.com