1. The construction site should have sufficient fire protection facilities according to the project structure, such as fire water sources, fire fighting pools, fire sand, and fire fighting equipment.
2. Fire-fighting equipment must be placed in a clearly accessible place. Generally, the height of the fire-fighting equipment should not exceed 1.5 meters. The height of the seat-type must be 15 centimeters. It should be placed in a cool and ventilated place.
3 , fire equipment should be designated person responsible for management, maintenance, inspection once a month, regular dressing, dry powder fire extinguisher is valid for five years.
4. The fire-fighting equipment of high-rise buildings shall be equipped with sketch maps of equipment and hang on the construction site.
5 , high-rise building according to JGJ3-91 "reinforced concrete high-rise building structure design and construction" requirements should be set up temporary fire water supply system, so that synchronization with the construction, temporary fire water supply system high-pressure pump should be provided by a dedicated line.
6. The number of fire equipment specifications (dry powder extinguisher 4 kg, 8 kg) at the construction site is as follows:
1 ) Kitchen: The area is within 100m 2 and at least 2 dry powder fire extinguishers are provided.
2) material bunker: within the area 50m ², foam fire extinguisher with not less than 2, each additional 50m ² foam fire extinguisher was equipped with no less than one, according to the number stored combustible fire equipment may increase, and a dispersion in Clearly accessible.
3 ) Construction offices, lounges, and conference rooms with an area of less than 100m 2 and no less than 2 dry powder fire extinguishers . Each additional 50m ² with a dry powder fire extinguisher of not less than one.
4) The data room, archives, combustibles stacking place, the area is within 50m 2 , no less than 2 dry powder fire extinguishers .
5 ) There should be no less than 2 electrical rooms, distribution rooms, and dry powder fire extinguishers .
6 ) The cab of vertical transportation equipment (including construction elevators, tower cranes, on-site transportation machinery) shall be equipped with at least one dry powder fire extinguisher .
7 ) Oil storage, storage of flammable and explosive warehouses, within 50m 2 in area , and no less than 2 dry powder fire extinguishers . No less than 1 dry powder fire extinguisher per 50m2 .
8) Wood place within the area 50m ², dry powder fire extinguishers with not less than 2, or provided 50--100 kilograms tanks with fire bucket with not less than two.
9) dormitory, each with a 25m ² fire extinguisher, such as over an area of 1000m ², should ² each 500m, the establishment of a 2M ² pool fire.
10) Temporary workplaces should be equipped with not less than 2 fire fighting equipment and other fire-fighting aids.
11 ) There are 4 dry powder fire extinguishers within 500m2 of the building under construction . Each additional 500m ², was equipped with a dry chemical fire extinguisher.
12 ) Replace the fire-fighting equipment powder or replace the fire-fighting equipment in time to ensure that dangerous situations can ensure the extinguishing of fire.
13 ) Fire-fighting equipment, fire-fighting and rescue facilities, and anyone cannot divert it for other uses and damage.
China leading manufacturers and suppliers of 2 Wires Showcase Track Rail,Led Track Rail Conductive Strip, and we are specialize in Shelf Case Lighting Power Rail,Conductive Track Rail, etc. we can custom for you.
2 Wires Showcase Track Rail,Led Track Rail Conductive Strip,Shelf Case Lighting Power Rail,Conductive Track Rail
Farwise Technology Co.,Ltd. , https://www.farwiselighting.com