The kitchen is also a very important place in the home. There is a drainage, wire and pipeline project. Once the kitchen is in trouble, it is a very troublesome thing. Therefore, all decoration risks should be excluded from the renovation process.
Zhibang Kitchen Cabinets
The kitchen is the main drainage area, so during the renovation process, the ground leveling should have a certain slope, so that water can flow to the floor drain, and the waterproofing project must be done well. When the water pipeline is installed, it should be laid out reasonably, horizontally and vertically, and not near the power supply. The shortest straight distance from the power supply is 0.2 centimeters. The connection between the pipeline and various products must be tight, and the installation must be checked for leakage. The wire and cable project cannot be ignored either, because the consequences of the problem when the power cord is buried in a wall, suspended ceiling, floor or floor are really unthinkable. PVC pipe must be worn during installation. There should be no kinks in the pipe. The bent position of the wire protection tube should use the matching elbow tool or matching elbow, and there should be no folds. At the same time, it should be noted that the distance between strong and weak electricity should be about 50 cm in order to reduce the electromagnetic interference between them and prevent unsafe accidents from occurring.
Kitchen renovation experience notes kitchen cabinet doors
Solids Control System Equipment
Waste treatment equipment: drill cuttings spin dryer, waste slurry centrifuge, drill cuttings drying screen, flocculation dewatering system, screw conveyor, sludge vacuum Pump, screw pump, solidification equipment, oily sludge treatment system, etc.
Solids control equipment: drilling fluid vibrating screen, desander, desilter, mud cleaner, decanter centrifuge, vacuum deaerator, sand pump, shear pump, agitator, mud gun, jet mixing device and funnel , Liquid-gas separator, electronic ignition device, mud tank, etc.
Industrial decanter centrifuge: the drum diameter covers the whole series of 220/360/450/550/760mm, high speed, large aspect ratio centrifuge.
Vibrating screen: It can be adapted to the screens of various domestic manufacturers' vibrating screens, and the products have passed the API RP13C test of the United States.
Complete mud system: oil drilling solids control system, non-excavation and coalbed methane drilling rig mud recovery system, piling and shield mud purification system, drilling waste treatment system, industrial environmental protection mining and other solid-liquid separation systems.
Explosion-proof electric control products: meet the domestic CNEX explosion-proof and international IECEX explosion-proof certification.
Solids Control System Equipment,Drilling Fluid Vibrating Screen,Decanter Centrifuge,Vacuum Deaerator,Sand Pump
Rugao Yaou Import & Export Trade Co., Ltd , https://www.ntyaoumachinery.com